New Year Qiz- Jan2016

December 29, 2015
1.  Out of the following which one is not a non-conventional source of energy  ?
A.
B.
C.
D.
2.  Pulverized coal is.....
A.
B.
C.
D.
3.  Heating value of Indonesian coal is approximately?
A.
B.
C.
D.
4.  Water gas is a mixture of ?
A.
B.
C.
D.
5.  . Coal used in power plant is also known as
A.
B.
C.
D.
6.  Which of the following is considered as superior quality of coal ?
A.
B.
C.
D.
 

POWER - QUIZ -JULY 15

June 30, 2015
1. Name the first  proposed geothermal plant in india?
a) kerala , b) chattisgarh , c) maharastra

2. Name the famous company to launch 4G , also leader in power , oil & steel?
a) jindal , b) tata , c) reliance , d) goenka

3. Name the company like damodar vally co-operation , which has take over in damodar river , to take approval on river ganga to use its water for power plant system.

a) ganga vally co-operation , b) indian clean ganga co-operation , c)Power system Inc Ltd

4.
It is a mechanical means that is used to turn off the burner or shut off fuel to the boiler to prevent it from running, once the water goes below a certain point.
A.
B.
C.
D.
 

POWER QUIZ- MAR 15

March 15, 2015
1) Name the companies who win the coal mines by action?
a) Talabira-I,Orissa , b) Jitpur,Jharkhand , c) Sarisetholi,West Bengal , d) Amelia North,M.P

2) According to industrial thermodynamical calculation how much Ton of steam required to generate 1MW.

3) What do you mean by Reverse automation Technique?

4) Which State in india has the highest MW of Power Plant?

5) Name the company having power plants outside india?
 

POWER PLANT QUIZ-OCTOBER ISSUE

October 13, 2014
This questions are developed or created by PPIC team for reader interest.

1. What do you mean by HP dosing?

2. What is the working process of SBA(Strong Base Anion) in De-mineral Plant?

3. VFD control or Damper control for force draft fan? which one is energy efficient?

4. What are the basic strategy for Energy management system?

5. Does government provide any subsidies on thermal coal base power plant? why
 

POWER QUIZ OF THE MONTH-SEPTEMBER ISSUE

September 15, 2014
1. What is the full for of KKS system?

2. What are the methods to make a green house building in the premises of power plant?

3. A 60MW Power Plant is Having of APC(auxillary power consumption) of 8.98% , Can it be possible to bring APC below 8%, If Yes How? (To know the answer about this mail to us on pp.ic@rediffmail.com).

4. What is the difference between critical & super critical boiler?

5. it is seen that many power sectors are switching towards Chinese make boiler & other equipment why?give two evidence?

6. The total  installed capacity of Rourkela steel plant(cpp) is.................MW?

7. Why private coal sectors are in endanger,which can hamper the production of thermal power plant?

8. Last Northern Grid failure happened in India on.............?
 

POWER QUIZ OF THE MONTH

August 30, 2014
1. Name the highest installed solar power capacity in India?

2. Name the state - planning for first Geo-Thermal energy?

3. What is Coal Yield percentage in India?

4. Name the oldest Nuclear power plant in India?

5. Installed Capacity of Adhunik Power in sarikella,orissa is ..........?
 

POWER QUIZ OF THE MONTH - NAGPUR

April 16, 2014
1. Koradi Thermal Power Station (KTPS) is located at Koradi near NagpurMaharashtra has an installed capacity of ..........MW?

2. Butibori Power has an installed capacity of ......MW?

3. Indo-Rama synthetic Power is located in ........area of Nagpur?

4. NPTI in nagur famous for which engineering course.

5. Abhijeer group located at hingna-nagpur , name the Managing director of company?
 

POWER QUIZ OF THE MONTH - KOLKATA

March 13, 2014
1. The first demonstration of electric light in Calcutta was conducted on July 24, ......... by P W Fleury & Co

2. CESC owns and operates four thermal power plant generating a total of ...... MW of power.

3. ..........the former head of the West Bengal Renewable Energy Development Agency, was the man behind the solar energy revolution in the state.

4. The main ther­mal power plants under WBPDCL are in Kolaghat, Bakreswar, Sagardighi, Santaldih,and ..........?

5. Engineering giant Larsen & Toubro (L&T) will invest Rs 10,000 to ............. crore for a 1600 megawatt power plant in West Benga?
 

POWER QUIZ OF THE MONTH - MEGHALAYA

February 9, 2014
1. How many power stations are there for MECL (MEGHALAYA ENERGY CO LTD) and name the highest capacity?

2. Shyam group planted there power plant at ...............,Meghalaya & what is the capacity?

3. Pradeep bagla GM of Amrit Cement India Limited (ACIL) will set up a 1MTPA cement plant with ....MW of cpp?

4. Assam would get a new 480 MW thermal power station and neighbouring Meghalaya two projects of total ...... MW to take care of their acute power crisis, Union Power Secretary......................... ?

5.
The Meghalaya government has sought a patch of land in ......... district in the State of orissa  for setting up a 1320 mw thermal power plant
 

POWER QUIZ OF THE MONTH-PUDUCHERRY

January 11, 2014
1. The Pondicherry Government is planning to augment the capacity of the gas power plant at Karaikal from the present 32.5 mw to .......mw

2. The Puducherry Power Corporation was incorporated on the year .............?

3.
The Comptroller and Auditor General of India (CAG) has pulled up the Puducherry government for losing an opportunity to obtain power at a reasonable cost due to ...............?

4. 
The 32.5 MW power plant at Thirumalai Rayan Pattinam in Karaikal ,project is likely to cost Rs ...........crore.

5.
NTPC clears gas power unit planned at ...... , puducherry of 400MW
 

POWER QUIZ OF THE MONTH -GUJRAT

December 7, 2013
1. OPC POWER VENTURE PLANNED FOR ....MW THERMAL POWER PLANT IN GUJRAT.

2. 1ST GEOTHERMAL POWER PLANT OF GURAT WILL START ON ........AREA.

3. AJAY DEVGAN TO INVEST ....... RS ON GUJRAT 25MW SOLAR POWER PROJECT WITH ROHA GROUP.

4. ....... IS THE ENERGY & OIL MINISTER OF GUJRAT.

5. GUVNL had signed 25-year power purchase agreements for 971.5 MW solar power with 88 developers in year ........
 

QUIZ OF THE FORTHNIGHT - DELHI (14.11.13 TO 29.11.13 )

November 13, 2013
1.Badarpur thermal power plant was commissioned in the year .....?

2. Installed capacity of rajghat power station is....MW ?

3. Rajpura power plant to start power selling from 17 jan .....?

4. first unit of 36.6MW was installed in 1963 for..........power plant , delhi ?

5 ..........................   is located at Bawana,New Delhi. The power plant is one of the gas based power plants ?

6. Rai power , delhi has a installed capacity of .............. MW ?
 

QUIZ OF THE FORTNIGHT (M.P) -18.10.13 TO 02.11.13

September 15, 2013
1.The first thermal power plant of amarkantak commissioned in march .....?
2.Satpura Thermal Power Plant is located at Sarni town near Ghoradongri Railway station in .........district of Madhya Pradesh, India.?

3.The installed capacity of MPPGCL as on 30.06.2010 is 3847.50 MW out of which madhya pradesh share is about ....... MW.?

4. Sasan Ultra Mega Power Project (UMPP) is an upcoming.......... pit-head coal-based power plant inMadhya Pradesh?

5............. are implementing a 1,200 MW coal-based thermal power plant in the Sidhi district, Madhya Pradesh. The power project will be commissioned with two units of 600 MW each, with an aggregate designed capacity of 1,200 MW upon completion of construction.?

 

QUIZ OF THE WEEK (Tamil Nadu) - 01.09.13 - 15.09.13

August 19, 2013
1. Kudankulam Nuclear Power Plant is a nuclear power station in Koodankulam in district?

2.Udupi Power Corporation’s has a capacity of ........MW ?

3. Name the power minister of Tamil Name?

4. The 600 MW Neyveli Thermal Power Station-I in which the first unit was synchronized in ....?

5. Barsingsar Thermal Power Station 250 MW is having ......units?

6. hydel power station in Nilgiris district govt planned to invest rs.........?

7. 1,600-MW Uppur thermal power plant is planned at............district ?

8. Vallur conventional power plant situated at ........?

9. Mettur thermal power station has a capacity of .....?

10. olappalayam TATA's solar power has a capacity of ....MW and expected to generate ...MU in this year?
Olappalayam
Olappalayam
Olappalayam
Olappalayam
 

QUIZ OF THE WEEK (ASSAM SPECIAL)- 13.08.13 TO 19.08.13

August 12, 2013
1. 750 MW Bongaigaon Thermal Power Station of NTPC at Bongaigaon will be partially commissioned in the year.... ?

2.
..........., ASSAM IS BIGGEST BASE LOAD Gas Turbine Power Generating Station in sixties of 20th century in ASIA?

3.
The first unit of the 363-MW combined cycle gas power plant at Palatana was set on .....?

4. ....... is the commissioner & secretary , IT & POWER dept , govt of assam ?

5. Loan taken by AEGCL for ABD project (Tranche-1)?

6. coal based power plant at margherita has a capacity of ......MW ?

7. UTDF sanctioned four 132 KV grid  substation at ......,......,......,...... .
coal based power plant at Margherita
coal based power plant at Margherita
ADB project (Tranche I: Loan
Commissioner & Secretary, IT & Power Departments, Government Of Assam, Dispur - See more at: http://egov.eletsonline.com/2012/09/power-sector-in-assam/#sthash.ctnWome2.dpuf
Commissioner & Secretary, IT & Power Departments, Government Of Assam, Dispur - See more at: http://egov.eletsonline.com/2012/09/power-sector-in-assam/#sthash.ctnWome2.dpuf
Commissioner & Secretary, IT & Power Departments, Government Of Assam, Dispur - See more at: http://egov.eletsonline.com/2012/09/power-sector-in-assam/#sthash.ctnWome2.dpuf
Commissioner & Secretary, IT & Power Departments, Government Of Assam, Dispur - See more at: http://egov.eletsonline.com/2012/09/power-sector-in-assam/#sthash.ctnWome2.dpuf
Commissioner & Secretary, IT & Power Departments, Government Of Assam, Dispur - See more at: http://egov.eletsonline.com/2012/09/power-sector-in-assam/#sthash.ctnWome2.dpuf
 

QUIZ OF THE WEEK (KERALA SPECIAL) - 06.08.13 TO 12.08.13

August 6, 2013
1 First Electricity Minister of Kerala?
2 Installed capacity of Idukki Power Station?
3 A hydel project in Kerala is planned to construct in Nayagra Model. Which is it?
4 Owner of Kayamkulam Thermal Power project?
5 Smallest Hydel power project of KSEB?
6 When Bimonthly spot billing was extended all over Kerala?
7 From where 400 KV line is comming to Madakkathara Sub Station?
8 Where is the load despatch centre of KSEB?
9 Installed capacity of Brahmapuram Diesel Power Station?
10 Which hydel project in Kerala is generating electricity with lowest quantity of water?
11 Installed capacity of Kuttiadi Extension Scheme?
12 In which district Kakkad hydel project is located?
13 Largest Consumer of electricity in Kerala?
14 Which corporation is supplying electricity to 400 KV Madakkathara sub station?
15 Where is pooyamkutty situated?
16 Second largest hydel station of Kerala?
17 Installed capacity of Sabarigiri power station?
18 Moozhiyar Hydel project utilises water from which river?
19 During first five year plan, installed capacity of Kerala?
20 At the time of starting first five year plan, Hydel generation of kerala?

post your answer to pp.ic@rediffmail.com
 

VISION POWER & ISPAT , ADRA , W.B

June 10, 2013
Q ) EXPLAIN THE WORKING OF AN ENRAF LEVEL GAUGE?

ANS -Enraf level gauge is based on the SER powered null balance technique. A displacer serves as continuous level sensing element. A two phase ser motor controlled by a capacitive balance system winds unwinds the the measuring wire until the tension in the weight springs is in balance with the weight of the displaced part immersed in the liquid. The sensing system in balance measures the two capacitance formed by the moving central sensing rod provided by the two capacitor plates and the SI plates.

Q)  If we have 750 mm height boiler drum level, so what is span & zero value for a DPT transmitter?

ANS--=  -750 TO + 750 MMWC

 

HEL (HALDIA ENERGY LIMITED) - 2013

March 23, 2013
Q ) The change in the value of analog signal during the conversion process produces what is called is....

a. resolution error ...b. sampling error....c. nyquist error...d. quantization error
 

BAJAJ POWER- 2012

March 9, 2013
Q ) Why expansion bellow is provided in  between ash hopper and vessel in big ash handling plant?

Ans - Expansion below are used  to provide isolation from vibrators which are mounted on the surface of the vessel to remove the fly ash contents before it's temperature decreases to prevent solidification of fly ash on the walls of vessel.

FOR DETAIL CLARIFICATION PLEASE REFER TO - http://mbl.in/ash_handling_pressure_pneumatic_conveying_system.html
 

JINDAL POWER - 2013

February 19, 2013
WHY ATTEMPERATION IS REQUIRED IN BOILERS ?

ANS - One of the methods used to control the final steam temperature in a packaged boiler is interstage attemperation.In this method,feed water of demineralized quality(having nearly the same TDS as the final steam)is injected in between two stages of a superheater system as shown above.Generally in a convective type of superheater design,the uncontrolled final steam temperature decreases as the load decreases,while with a radiant superheater system,the uncontrolled steam temperature decreases as the load increases. Injecting the feed water achieves the desired final steam temperature at a given load. The load range over which the steam temperature can be maintained depends on the boiler design.Generally it is from 50 to 100 % but with special designs,the range can be extended.

When the feed water is not demineralized or has a high TDS(total dissolved solids),the amount of solids that can get into the final steam is high. For example,if the feed water has a TDS of 15 ppm and the spray quantity required is 10 % of the total steam,then a mass balance of solids around the desuperheater results in:

Solids after attemperation=(90x0 +10x15)/100=1.5 ppm,which is too much.[In this equation,steam is considered to have nearly zero solids]. Typically depending on steam pressure and turbine make,solids permitted in final steam could range from 30 to 150 ppb(parts per billion). Hence in such cases, a heat exchanger could be used to cool the steam and then inject the condensate between the two stages. This exchanger could be located inside the drum and be cooled by the boiler water itself. However another option is to use a separate exchanger as shown above and use it to cool some steam taken from the drum and then inject it as spray. The condensed steam has nearly zero solids and hence is considered suitable for spray

 

ULTRATECH

January 15, 2013
what is the difference between the 2 wire level transmitter and 4 wire level transmitter?

AnsIn case of 4 wire transmitter, 2 wire is used to give power to the transmitter and other 2 wire to transmit the signal. In case of 2 wire , the 2 wire carries the power as well as the signal. Example- 4 to 20 mA is flowing through the 2 wire and according to level the current is changing.
 

RENUKA SUGAR LIMITED

January 15, 2013
Why would an Engineer sometimes consider combining FEEDBACK and 
FEED FORWARD control in some applications?

ANS -  In some applications, the compensation provided by feedback control is not sufficient & accurate .Also, the feed forward control is faster but it is difficult to predict all the manipulated variables.Hence a combination of both is  used.
 

HOW TO CALCULATE THE EVAPORATION LOSS IN COOLING TOWER

December 20, 2012
CALCULATION OF EVAPORATION LOSSES (1000 M3/HR):
 
Latent heat of evaporation is 540.5 k.cal./kg of water say 550 k.cal./kg.

Heat load = m x cp x (th – tc )
Where cp = specific heat of water = 1

th = hot water temp. = 450C

tc = cooled water temp. =350C

m =weight of water kg.


550 k.cal. = m x 1 x ( 45 – 35 )0C = evaporation of 1 kg of water
m = 550 = 55.0 kg of water.
10 x 1

i.e. 55.0 kg of water cools by ( 45 – 35 = 100C ), releases 550k.cal.of heat

Therefore when 55.0 kg of water is cooled from 450C to 350C it evaporates 1kg of water.
Therefore % of evaporation = 1 x 100 / 55.0 = 1.8 %

Therefore for 1000 M3/ hr. water evaporated = 18.0 M3/hr

Thus to cool 1000 M3 / hr of water from 450C to 350C, 18.0 M3/ hr of water is to be evaporated

This can be achieved by supplying air with the help of fan or by nozzles.
Fans and the nozzles are the instrument to supply air to evaporate 18.0 M3 / hr of water and hence there is no difference in evaporation losses because of nozzles. For same delta ‘T’ based on the above we have to calculate the numbers of nozzles, which is equivalent to the fan as far as quantity of air, is concerned.
 
 

what is the operation principle of cooling tower

December 20, 2012
Ans-
PRINCIPLE OF OPERATION:
 

All the cooling towers are working on the principle of water evaporation. On evaporation of water, both heat and mass transfer takes place, and water gets cooled. Rate of evaporation is increased by increasing air velocity. In case of cooling tower we call this an air draft. This air draft is created by mechanical system of power driven fan. We create the same air draft in our cooling tower, by using specially designed spray nozzles.

Evaporation is a natural phenomenon. Water will evaporate till air in contact with it gets saturated with moisture. Evaporation cannot be more than the saturation point of air. Thus total evaporation will depend upon the moisture holding capacity of air, which depends on humidity.

When hot water is sprayed from top of the cooling tower through our nozzles, it gives jet effect and air is sucked from the area surrounding each nozzle. Air and water travel in co current direction down to the basin. During this travel, air cools down the water to desired temperature, and escape through FRP louvers.

Thus our cooling tower does the same performance as done by the Fan Operated Cooling Tower, without the use of fan.

With the above characteristics our cooling tower has dual benefits, one there is no power requirement and second there is no break down / no maintenance. Another important advantage is that, because there is no fan, there is no scope for electrical spark or friction spark. It can be installed safely in the, inflammable area.


 

HOW TO ADJUST THE VIBRATION PROBE IN 3500 BENTLY TO GET -10VDC OUTPUT?

December 20, 2012
ANS- pls wait
 

Explain the role of split range control in control valve?

August 31, 2012
Answer- 
split range control is which the output of a controller is 
split to two or more control valves. For eg,
For 0% controller output,valve A fully open & B fully 
closed.
For 25%, Valve A 75% open,B 25% open
For 50%, Valve A& B- 50% open,
For 75%, Valve A 25%open, B-75%open..
For 100%, Valve A fully closed & valve B Fully Open..

Like this, the controller output action can be set depending 
upon the application.
as well as in split range control the control signal is split in two 
ranges according to the application .for eg,4-20MA.signal 
can be used as 4-12 MA. FOR VALVE A OPEN i.e.50%.& 12-20MA 
for vlv B open.vice-versa.
 

why drum level is increased when one of the running coal elevations are suddenly tripped?

August 31, 2012
wait for answer?
 

what is the defination of efficiency in the high pressure boiler? what is the formula its efficiency?

August 3, 2012
ANS- BOILER EFFICIENCY:Ratio between heat output and heat input,
it's called boiler efficiency.



FORMULA FOR BOILER 
EFFICIENCY:
                    Q*(H-h)/q*GCV
 
Q       : Quantity of steam (kg/hr)
q       : quantity of coal consumption(kg/hr)
H       : Enthalpy of steam(Kcal/hr)
h       : Enthalpy of fead water(Kcal/hr)
GCV     : Gross calorific value of coal
 

MONNET POWER LIMITED- 2012

July 9, 2012
1. WHAT IS THE OPERATING PRINCIPAL OF I/H CONVERTER & EFFECT OF HP DEMAND ON IT IN CASE OF HUGE LOAD FLUCTUATION?
ANSWER to this question shall be avail on 12th july updates,keep viviting
 

UTTAM GALVA LIMITED- 2011

July 8, 2012
1. Why Bently Nevada use negative voltage for vibration probes?
Answer-- When Don Bentley worked on making solid-state
versions of the eddy-current measurement system (it was
actually originally designed in the 1930s by GE engineers
using vacuum tubes), he had a choice between using N-P-N
s
were quite expensive, so he chose the least expensive of
transistors or P-N-P transistors. At the time, transisto
r
the two: P-N-P (apparently, PNP transistors they were less
expensive to manufacture 50 years ago than their NPN
ive bias volta
counterparts).

ecause the circuits used PNP transistors, a negative bias

Bvoltage was required rather than a posi
tge.
Don chose -18V. This was later changed to -24V to allow
more linear range from the transducer.

ime they did,
there were so many Bently Nevada eddy curren
At that time, the industrial instrumentation community had
not yet standardized on +24 vdc, and by the
tt vibration
sensors installed that changing to +24V rather than -24V
was not greeting with enthusiasm by users. Hence, it has
remained -24V to this day.

 
 
Code End http://www.powerplantinstrumentationcontrol.yolasite.com>