Showing category "INTERVIEW QUESTION" (Show all posts)

New Year Qiz- Jan2016

Posted by Debyendu Chakraborty on Tuesday, December 29, 2015, In : INTERVIEW QUESTION 
...
1.  Out of the following which one is not a non-conventional source of energy  ?

Continue reading ...
 

POWER - QUIZ -JULY 15

Posted by Debyendu Chakraborty on Tuesday, June 30, 2015, In : INTERVIEW QUESTION 
1. Name the first  proposed geothermal plant in india?
a) kerala , b) chattisgarh , c) maharastra

2. Name the famous company to launch 4G , also leader in power , oil & steel?
a) jindal , b) tata , c) reliance , d) goenka

3. Name the company like damodar vally co-operation , which has take over in damodar river , to take approval on river ganga to use its water for power plant system.

a) ganga vally co-operation , b) indian clean ganga co-operation , c)Power system Inc Ltd

...

Continue reading ...
 

POWER QUIZ- MAR 15

Posted by Debyendu Chakraborty on Sunday, March 15, 2015, In : INTERVIEW QUESTION 
1) Name the companies who win the coal mines by action?
a) Talabira-I,Orissa , b) Jitpur,Jharkhand , c) Sarisetholi,West Bengal , d) Amelia North,M.P

2) According to industrial thermodynamical calculation how much Ton of steam required to generate 1MW.

3) What do you mean by Reverse automation Technique?

4) Which State in india has the highest MW of Power Plant?

5) Name the company having power plants outside india?

Continue reading ...
 

POWER PLANT QUIZ-OCTOBER ISSUE

Posted by Debyendu Chakraborty on Monday, October 13, 2014, In : INTERVIEW QUESTION 
This questions are developed or created by PPIC team for reader interest.

1. What do you mean by HP dosing?

2. What is the working process of SBA(Strong Base Anion) in De-mineral Plant?

3. VFD control or Damper control for force draft fan? which one is energy efficient?

4. What are the basic strategy for Energy management system?

5. Does government provide any subsidies on thermal coal base power plant? why

Continue reading ...
 

POWER QUIZ OF THE MONTH-SEPTEMBER ISSUE

Posted by Debyendu Chakraborty on Monday, September 15, 2014, In : INTERVIEW QUESTION 
1. What is the full for of KKS system?

2. What are the methods to make a green house building in the premises of power plant?

3. A 60MW Power Plant is Having of APC(auxillary power consumption) of 8.98% , Can it be possible to bring APC below 8%, If Yes How? (To know the answer about this mail to us on pp.ic@rediffmail.com).

4. What is the difference between critical & super critical boiler?

5. it is seen that many power sectors are switching towards Chinese make boiler & other equipment why?give...
Continue reading ...
 

POWER QUIZ OF THE MONTH

Posted by Debyendu Chakraborty on Saturday, August 30, 2014, In : INTERVIEW QUESTION 
1. Name the highest installed solar power capacity in India?

2. Name the state - planning for first Geo-Thermal energy?

3. What is Coal Yield percentage in India?

4. Name the oldest Nuclear power plant in India?

5. Installed Capacity of Adhunik Power in sarikella,orissa is ..........?

Continue reading ...
 

POWER QUIZ OF THE MONTH - NAGPUR

Posted by Debyendu Chakraborty on Wednesday, April 16, 2014, In : INTERVIEW QUESTION 
1. Koradi Thermal Power Station (KTPS) is located at Koradi near NagpurMaharashtra has an installed capacity of ..........MW?

2. Butibori Power has an installed capacity of ......MW?

3. Indo-Rama synthetic Power is located in ........area of Nagpur?

4. NPTI in nagur famous for which engineering course.

5. Abhijeer group located at hingna-nagpur , name the Managing director of company?
Continue reading ...
 

POWER QUIZ OF THE MONTH - KOLKATA

Posted by Debyendu Chakraborty on Thursday, March 13, 2014, In : INTERVIEW QUESTION 
1. The first demonstration of electric light in Calcutta was conducted on July 24, ......... by P W Fleury & Co

2. CESC owns and operates four thermal power plant generating a total of ...... MW of power.

3. ..........the former head of the West Bengal Renewable Energy Development Agency, was the man behind the solar energy revolution in the state.

4. The main ther­mal power plants under WBPDCL are in Kolaghat, Bakreswar, Sagardighi, Santaldih,and ..........?

5. Engineering giant Larsen & Toubr...
Continue reading ...
 

POWER QUIZ OF THE MONTH - MEGHALAYA

Posted by Debyendu Chakraborty on Sunday, February 9, 2014, In : INTERVIEW QUESTION 
1. How many power stations are there for MECL (MEGHALAYA ENERGY CO LTD) and name the highest capacity?

2. Shyam group planted there power plant at ...............,Meghalaya & what is the capacity?

3. Pradeep bagla GM of Amrit Cement India Limited (ACIL) will set up a 1MTPA cement plant with ....MW of cpp?

4. Assam would get a new 480 MW thermal power station and neighbouring Meghalaya two projects of total ...... MW to take care of their acute power crisis, Union Power Secretary..................
Continue reading ...
 

POWER QUIZ OF THE MONTH-PUDUCHERRY

Posted by Debyendu Chakraborty on Saturday, January 11, 2014, In : INTERVIEW QUESTION 
1. The Pondicherry Government is planning to augment the capacity of the gas power plant at Karaikal from the present 32.5 mw to .......mw

2. The Puducherry Power Corporation was incorporated on the year .............?

3.
The Comptroller and Auditor General of India (CAG) has pulled up the Puducherry government for losing an opportunity to obtain power at a reasonable cost due to ...............?

4. 
The 32.5 MW power plant at Thirumalai Rayan Pattinam in Karaikal ,project is l...
Continue reading ...
 

POWER QUIZ OF THE MONTH -GUJRAT

Posted by Debyendu Chakraborty on Saturday, December 7, 2013, In : INTERVIEW QUESTION 
1. OPC POWER VENTURE PLANNED FOR ....MW THERMAL POWER PLANT IN GUJRAT.

2. 1ST GEOTHERMAL POWER PLANT OF GURAT WILL START ON ........AREA.

3. AJAY DEVGAN TO INVEST ....... RS ON GUJRAT 25MW SOLAR POWER PROJECT WITH ROHA GROUP.

4. ....... IS THE ENERGY & OIL MINISTER OF GUJRAT.

5. GUVNL had signed 25-year power purchase agreements for 971.5 MW solar power with 88 developers in year ........

Continue reading ...
 

QUIZ OF THE FORTHNIGHT - DELHI (14.11.13 TO 29.11.13 )

Posted by Debyendu Chakraborty on Wednesday, November 13, 2013, In : INTERVIEW QUESTION 
1.Badarpur thermal power plant was commissioned in the year .....?

2. Installed capacity of rajghat power station is....MW ?

3. Rajpura power plant to start power selling from 17 jan .....?

4. first unit of 36.6MW was installed in 1963 for..........power plant , delhi ?

5 ..........................   is located at Bawana,New Delhi. The power plant is one of the gas based power plants ?

6. Rai power , delhi has a installed capacity of .............. MW ?

Continue reading ...
 

QUIZ OF THE FORTNIGHT (M.P) -18.10.13 TO 02.11.13

Posted by Debyendu Chakraborty on Sunday, September 15, 2013, In : INTERVIEW QUESTION 
1.The first thermal power plant of amarkantak commissioned in march .....?
2.Satpura Thermal Power Plant is located at Sarni town near Ghoradongri Railway station in .........district of Madhya Pradesh, India.?

3.The installed capacity of MPPGCL as on 30.06.2010 is 3847.50 MW out of which madhya pradesh share is about ....... MW.?

4. Sasan Ultra Mega Power Project (UMPP) is an upcoming.......... pit-head coal-based power plant inMadhya Pradesh?

5............. are implementing a 1,200 MW coal-base...
Continue reading ...
 

QUIZ OF THE WEEK (Tamil Nadu) - 01.09.13 - 15.09.13

Posted by Debyendu Chakraborty on Monday, August 19, 2013, In : INTERVIEW QUESTION 
1. Kudankulam Nuclear Power Plant is a nuclear power station in Koodankulam in district?

2.Udupi Power Corporation’s has a capacity of ........MW ?

3. Name the power minister of Tamil Name?

4. The 600 MW Neyveli Thermal Power Station-I in which the first unit was synchronized in ....?

5. Barsingsar Thermal Power Station 250 MW is having ......units?

6. hydel power station in Nilgiris district govt planned to invest rs.........?

7. 1,600-MW Uppur thermal power plant is planned at............distri...
Continue reading ...
 

QUIZ OF THE WEEK (ASSAM SPECIAL)- 13.08.13 TO 19.08.13

Posted by Debyendu Chakraborty on Monday, August 12, 2013, In : INTERVIEW QUESTION 
1. 750 MW Bongaigaon Thermal Power Station of NTPC at Bongaigaon will be partially commissioned in the year.... ?

2.
..........., ASSAM IS BIGGEST BASE LOAD Gas Turbine Power Generating Station in sixties of 20th century in ASIA?

3.
The first unit of the 363-MW combined cycle gas power plant at Palatana was set on .....?

4. ....... is the commissioner & secretary , IT & POWER dept , govt of assam ?

5. Loan taken by AEGCL for ABD project (Tranche-1)?

6. coal based power plant at margherita has a ...
Continue reading ...
 

QUIZ OF THE WEEK (KERALA SPECIAL) - 06.08.13 TO 12.08.13

Posted by Debyendu Chakraborty on Tuesday, August 6, 2013, In : INTERVIEW QUESTION 
1 First Electricity Minister of Kerala?
2 Installed capacity of Idukki Power Station?
3 A hydel project in Kerala is planned to construct in Nayagra Model. Which is it?
4 Owner of Kayamkulam Thermal Power project?
5 Smallest Hydel power project of KSEB?
6 When Bimonthly spot billing was extended all over Kerala?
7 From where 400 KV line is comming to Madakkathara Sub Station?
8 Where is the load despatch centre of KSEB?
9 Installed capacity of Brahmapuram Diesel Power Station?
10 Which hydel project i...
Continue reading ...
 

VISION POWER & ISPAT , ADRA , W.B

Posted by Debyendu Chakraborty on Monday, June 10, 2013, In : INTERVIEW QUESTION 
Q ) EXPLAIN THE WORKING OF AN ENRAF LEVEL GAUGE?

ANS -Enraf level gauge is based on the SER powered null balance technique. A displacer serves as continuous level sensing element. A two phase ser motor controlled by a capacitive balance system winds unwinds the the measuring wire until the tension in the weight springs is in balance with the weight of the displaced part immersed in the liquid. The sensing system in balance measures the two capacitance formed by the moving central sensing rod p...


Continue reading ...
 

HEL (HALDIA ENERGY LIMITED) - 2013

Posted by Debyendu Chakraborty on Saturday, March 23, 2013, In : INTERVIEW QUESTION 
Q ) The change in the value of analog signal during the conversion process produces what is called is....

a. resolution error ...b. sampling error....c. nyquist error...d. quantization error

Continue reading ...
 

BAJAJ POWER- 2012

Posted by Debyendu Chakraborty on Saturday, March 9, 2013, In : INTERVIEW QUESTION 
Q ) Why expansion bellow is provided in  between ash hopper and vessel in big ash handling plant?

Ans - Expansion below are used  to provide isolation from vibrators which are mounted on the surface of the vessel to remove the fly ash contents before it's temperature decreases to prevent solidification of fly ash on the walls of vessel.

FOR DETAIL CLARIFICATION PLEASE REFER TO - http://mbl.in/ash_handling_pressure_pneumatic_conveying_system.html

Continue reading ...
 

JINDAL POWER - 2013

Posted by Debyendu Chakraborty on Tuesday, February 19, 2013, In : INTERVIEW QUESTION 
WHY ATTEMPERATION IS REQUIRED IN BOILERS ?

ANS - One of the methods used to control the final steam temperature in a packaged boiler is interstage attemperation.In this method,feed water of demineralized quality(having nearly the same TDS as the final steam)is injected in between two stages of a superheater system as shown above.Generally in a convective type of superheater design,the uncontrolled final steam temperature decreases as the load decreases,while with a radiant superheater system,t...
Continue reading ...
 

ULTRATECH

Posted by Debyendu Chakraborty on Tuesday, January 15, 2013, In : INTERVIEW QUESTION 
what is the difference between the 2 wire level transmitter and 4 wire level transmitter?

AnsIn case of 4 wire transmitter, 2 wire is used to give power to the transmitter and other 2 wire to transmit the signal. In case of 2 wire , the 2 wire carries the power as well as the signal. Example- 4 to 20 mA is flowing through the 2 wire and according to level the current is changing.
Continue reading ...
 

RENUKA SUGAR LIMITED

Posted by Debyendu Chakraborty on Tuesday, January 15, 2013, In : INTERVIEW QUESTION 
Why would an Engineer sometimes consider combining FEEDBACK and 
FEED FORWARD control in some applications?

ANS -  In some applications, the compensation provided by feedback control is not sufficient & accurate .Also, the feed forward control is faster but it is difficult to predict all the manipulated variables.Hence a combination of both is  used.
Continue reading ...
 

HOW TO CALCULATE THE EVAPORATION LOSS IN COOLING TOWER

Posted by Debyendu Chakraborty on Thursday, December 20, 2012, In : INTERVIEW QUESTION 
CALCULATION OF EVAPORATION LOSSES (1000 M3/HR):
 
Latent heat of evaporation is 540.5 k.cal./kg of water say 550 k.cal./kg.

Heat load = m x cp x (th – tc )
Where cp = specific heat of water = 1
...

Continue reading ...
 

what is the operation principle of cooling tower

Posted by Debyendu Chakraborty on Thursday, December 20, 2012, In : INTERVIEW QUESTION 
Ans-
PRINCIPLE OF OPERATION:
 

All the cooling towers are working on the principle of water evaporation. On evaporation of water, both heat and mass transfer takes place, and water gets cooled. Rate of evaporation is increased by increasing air velocity. In case of cooling tower we call this an air draft. This air draft is crea...


Continue reading ...
 

HOW TO ADJUST THE VIBRATION PROBE IN 3500 BENTLY TO GET -10VDC OUTPUT?

Posted by Debyendu Chakraborty on Thursday, December 20, 2012, In : INTERVIEW QUESTION 
ANS- pls wait

Continue reading ...
 

Explain the role of split range control in control valve?

Posted by Debyendu Chakraborty on Friday, August 31, 2012, In : INTERVIEW QUESTION 
Answer- 
split range control is which the output of a controller is 
split to two or more control valves. For eg,
For 0% controller output,valve A fully open & B fully 
closed.
For 25%, Valve A 75% open,B 25% open
For 50%, Valve A& B- 50% open,
For 75%, Valve A 25%open, B-75%open..
For 100%, Valve A fully closed & valve B Fully Open..

Like this, the controller output action can be set depending 
upon the application.
as well as in split range control the control signal is split in two 
ran...

Continue reading ...
 

why drum level is increased when one of the running coal elevations are suddenly tripped?

Posted by Debyendu Chakraborty on Friday, August 31, 2012, In : INTERVIEW QUESTION 
wait for answer?
Continue reading ...
 

what is the defination of efficiency in the high pressure boiler? what is the formula its efficiency?

Posted by Debyendu Chakraborty on Friday, August 3, 2012, In : INTERVIEW QUESTION 
ANS- BOILER EFFICIENCY:Ratio between heat output and heat input,
it's called boiler efficiency.



FORMULA FOR BOILER 
EFFICIENCY:
                    Q*(H-h)/q*GCV
 
Q       : Quantity of steam (kg/hr)
q       : quantity of coal consumption(kg/hr)
H       : Enthalpy of steam(Kcal/hr)
h       : Enthalpy of fead water(Kcal/hr)
GCV     : Gross calorific value of coal

Continue reading ...
 

MONNET POWER LIMITED- 2012

Posted by Debyendu Chakraborty on Monday, July 9, 2012, In : INTERVIEW QUESTION 
1. WHAT IS THE OPERATING PRINCIPAL OF I/H CONVERTER & EFFECT OF HP DEMAND ON IT IN CASE OF HUGE LOAD FLUCTUATION?
ANSWER to this question shall be avail on 12th july updates,keep viviting
Continue reading ...
 

UTTAM GALVA LIMITED- 2011

Posted by Debyendu Chakraborty on Sunday, July 8, 2012, In : INTERVIEW QUESTION 
1. Why Bently Nevada use negative voltage for vibration probes?
Answer-- When Don Bentley worked on making solid-state
versions of the eddy-current measurement system (it was
actually originally designed in the 1930s by GE engineers
using vacuum tubes), he had a choice between using N-P-N
s
were quite expensive, so he chose the least expensive of
transistors or P-N-P transistors. At the time, transisto
r
the two: P-N-P (apparently, PNP transistors they were less
expensive to manufacture 50 year...

Continue reading ...
 

ELECTROSTEEL CASTING LIMITED- 2011

Posted by Debyendu Chakraborty on Saturday, July 7, 2012, In : INTERVIEW QUESTION 
WHAT IS ZERO SUPPRESSION & ZERO ELEVATION ? 
 
Answer -- Zero Suppression: suppose a DPT is mounted at the bottom of
the tank through an impulse pipeline,then even if the tank 
is empty the impulse pipeline will have some water in it.
This water will exert pressure on the HP side of the DPT 
and we will get some output even if the tank is empty.so 
the output need to be supressed to the zero value

Zero Elevation:suppose a DPT is mounted at the bottom of 
the closed tank and to the LP the impul...

Continue reading ...
 

MATRIX FERTILIZER & CHEMICAL LTD- 2012

Posted by Debyendu Chakraborty on Thursday, July 5, 2012, In : INTERVIEW QUESTION 
1. HOW TO CALCULATE WAKE FREQUENCY FOR THERMOWELL WITHOUT USING ANY SOFTWARE?
 
Answer ----   2.64 * FLUID VELOCITY(FEET/SEC) / DIA OF WELL TIP (INCH)

Continue reading ...
 

Himadri Chemical & Fertiliser - 2011

Posted by Debyendu Chakraborty on Saturday, June 30, 2012, In : INTERVIEW QUESTION 
1. Can you operate a control valve without a I to P converter ?

Answer- Yes , we can operate cv without I/P converter,just we have to adjust the regulator output air pressure according to I/P rated output by adjusting the knob of regulator correspondingly kg f/cm2 to 1.02 kg f/cm2 manually. the output of regulator should go to the input of mechanical positioner,supply pressure should remain as per cv characteristic and the output from the mechanical positioner should go to diaphragm of control...
Continue reading ...
 

HONEYWELL LIMITED -2010

Posted by Debyendu Chakraborty on Tuesday, June 26, 2012, In : INTERVIEW QUESTION 
1. What do you mean by instrument potential barriers,How many types are there?

Answer- Instrument Potential barrier is the energy inserted in order to go against the passage of electron.

Electric transport in sputtered LiNbO3 (LN) films sandwiched between TiN and Si electrodes revealed Schottky emission at low electric field and Poole-Frenkel conduction at higher electric field without any hysteresis. The Poole-Frenkel conduction region was brought into the reproducible potential barrier-contro...

Continue reading ...
 

ESSAR POWER - 2010

Posted by Debyendu Chakraborty on Tuesday, June 26, 2012, In : INTERVIEW QUESTION 
1. How smart plant instrumentation related to IN tools?
 
Ans- Smart plant instrumentation previously marketed as IN tools, reflects intergraph continuing investment in smart plant technology and its use in smart plant instrumentation,such as the engineering framework integration,enhanced smart loop,easily navigable plant hiearchy display and smart plant suit code compatible.
The smart plant instrumentation powerd by INtools continues to answer the instrumentation engg,design and lifecycle opera...
Continue reading ...
 

BENGAL ENERGY LIMITED

Posted by Debyendu Chakraborty on Monday, June 25, 2012, In : INTERVIEW QUESTION 
1. WHAT IS THE WORKING PRINCIPLE OF HYDRA STEP (DRUM LEVEL INDICATOR).

Answer - Its works on the principle of resistivity. The discrimination between water & steam is based on the significant difference in resistivity between the two states over the saturation range.when a voltage applied to the tip,conduction takes place between tip and inside wall of column.when the resistance of probe is less than 100K its represents the water % in drum and if it is greater than 100K its represents the % st...